OverviewCOMPLIANCE & CONTROL

Built for South African grid codes

Most platforms retrofit international templates. Enerlyze is engineered around the standards your utility actually enforces — so connecting and staying connected is straightforward.

Standards we build to

The standards we engineer around

Each maps to a control function the EMS already performs.

Cape TownGqeberhaJohannesburgDurban

EEB 705

City of Cape Town

Interconnection of embedded generation (LV/MV/HV); SCADA signal exchange and control functions.

GCRPP

NERSA

Grid Connection Code for Renewable Power Plants; curtailment, Q/PF/V, ramp-rate and response behaviour.

GCBESF

NERSA

Grid Connection Code for Battery Energy Storage Facilities; charge/export control, mode toggles and setpoints.

NRS 097

South African

Power-quality requirements; we provide the measurements — sequence components and per-phase.

Eskom interconnection standards

Eskom

Embedded-generation interconnection across distribution.

RETEC testing pathway

Functional testing

We build for the functional tests measured at the SCADA boundary.

Please note

Enerlyze is engineered to meet the requirements of these standards. Grid-code certification is assessed per site and per point of connection together with the relevant utility — we support that process, we don't replace it.

Behind the codes

The control functions behind the codes

Production constraint / curtailment
Clamp active power to a limit.
Power gradient (ramp)
Bound how fast power changes, up and down.
Reactive power (Q)
Hold a Q setpoint at the point of connection.
Power factor (PF)
Hold a target PF.
Voltage (V)
Voltage regulation via reactive control.
Frequency response
Droop-based response, delegated to inverter firmware where appropriate.
Mode arbitration
Q / PF / V are mutually exclusive; switch cleanly between them on command.
Response characteristics

Predictable, measurable behaviour

The control loop is built to deliver the kind of setpoint feedback and response timing grid codes call for, with curtailment accuracy and ramp behaviour that hold up under test — the same behaviours assessed at the SCADA boundary during commissioning.

Protocols & interconnection

Speaks to the utility on its terms

Enerlyze integrates with utility SCADA over the protocols the codes specify — DNP3 (IEEE 1815) and IEC 60870-5-101/104 — sitting above the site's RTU as the plant controller.